fj: (Default)
fj ([personal profile] fj) wrote2007-12-01 04:55 pm
Entry tags:

(no subject)

Anything that involves drilling into the concrete parts of my domicile -- like the 11 foot high ceilings -- counts as a major project, even if it can be finished in 30 minutes. It is a dreadful thirty minutes, balancing with a vacuum-cleaner hose and a heavy drill on the top of a tall ladder, using every core and other muscle I have to push that fucking hammer-drill, pounding against my joints, into the fucking ceiling. Then I need the drill again to turn the anchor into the hole. Of course, hanging up four cabinets with seven glass doors and a hood that requires sawing custom holes into the cabinet counts as a major project too.

Well, I think I have done all the ones I can do myself now but one. It involves taking down the curtains off the tracks so I can re-attach a small part of the track to the ceiling, straightening it out against the other tracks so the curtains will fully open. The curtain guy simply never came back to fix this a year ago, and we stopped calling. Now I have done so much myself I think I can do this too. Of course, again, this track is in the ceiling 11 feet off the ground, and the one curtain I have to take down for it is, what, 9 feet tall and 10 feet wide? Made of heavy cloth and a light-blocking backing? In any case, it's one heavy mofo to handle. But when I do, the big things are done, done, done. It's just a little painting, patching, and getting some shelves cut to fit around the duct in the cabinet properly.

I keep being in situations where I think "You know, this would be a really bad moment for a major earthquake."

Post a comment in response:

This account has disabled anonymous posting.
If you don't have an account you can create one now.
HTML doesn't work in the subject.
More info about formatting